Power & lighting
Chases for new power points, switches and light runs on a rewire or a renovation.
Services in the wall, not on it
A chase is the channel we cut so your sparky or plumber can run services inside the wall instead of over it. Ours come out straight, cut to the depth the conduit needs, with the dust pulled off the tool instead of through the house.
What it covers
Chases for new power points, switches and light runs on a rewire or a renovation.
Conduit runs for data, TV, security and intercom cabling, kept clear of the power lines.
Channels for water lines, hydronic pipework and small waste runs in brick and block.
Pipe and drain runs chased in behind the wall so the head sits flush and the line is hidden.
Mains and sub-main runs chased from the board out, sized to the conduit going in.
Edges cut clean enough to patch, render and paint straight over.
On the job
How the job runs
We size the channel off the conduit or pipe going in. Cutting deeper than the service needs only weakens the wall and makes the patch harder.
Where the runs go, how many, and where they terminate gets agreed before we start — it is a lot cheaper to move a line on the wall than in it.
The chaser runs into an M-class vacuum so the dust is captured at the blade. In an occupied house we sheet up as well.
The chase is blown and vacuumed out so conduit sits in properly and the patch bonds to clean brick.
What it costs
Chasing is priced by the metre, adjusted for the material and the number of separate runs. Render over brick is quick; solid concrete is slower and costs more. A dozen short chases in different rooms takes longer than the same total metres in one straight run, because most of the time goes on setting up and moving. Booking the whole rewire in one visit is always cheaper than doing it room by room.
Get a free quoteNone of it is essential — we can work it out on the phone. It just gets you a firm price faster.
Where we work
Based in Sydney and on the road daily, with the Eastern Suburbs a home patch — and the rest of Sydney a short drive.
Eastern Suburbs
… and the rest of Sydney
Questions
Deep enough for standard conduit, and no deeper than the wall can take. There are limits on how much you can cut out of a masonry wall before you weaken it, especially horizontally — we cut to the conduit and no further, and if what is being asked would go past the limit we will say so rather than do it.
Carefully, and not always. Vertical chases are usually fine within limits, long horizontal chases in a structural wall often are not. If there is any doubt, that is an engineer's call — we will flag it rather than guess.
Very little. The chaser runs a vacuum off the tool so the dust goes into the machine, not into the room. In an occupied house we will still sheet up the area before we start.
We cut, vacuum out and leave the chase clean and ready for conduit. Patching and rendering is usually done by the trade following us once the services are in, but ask when you call and we will tell you what the job needs.
Also on the truck